[Index] [Search] [Download] [Bill] [Help]
2015
LEGISLATIVE ASSEMBLY FOR THE
AUSTRALIAN CAPITAL
TERRITORY
PLANNING, BUILDING AND
ENVIRONMENT
LEGISLATION AMENDMENT BILL 2015 (No
2)
EXPLANATORY STATEMENT
Presented by
Mr Mick Gentleman Minister for Planning
EXPLANATORY STATEMENT
This explanatory statement relates
to the Planning, Building and Environment Legislation Amendment Bill 2015 (No
2) (the bill) as presented to the Legislative Assembly. It has been prepared
in order to assist the reader of the bill and to help inform debate on it. It
does not form part of the bill and has not been endorsed by the Legislative
Assembly.
Background
Planning, building and environment
legislation has historically been amended by a number of methods, as
follows:
• the usual Act amendment process;
• by modification
using regulation (commonly referred to as a ‘Henry the Eighth’
amendment);
• through the Statute Law Amendment Bill process;
and
• as a consequence of other legislation. For example, the ACT
Civil Administrative Tribunal Legislation Amendment Act 2008 made
consequential amendments to the Building Act 2004.
These ways of
amending legislation in the Planning Portfolio, while effective, can be
confusing for community, industry and government users of the legislation. An
omnibus planning, building and environment legislation amendment bill enables
more minor matters to be dealt with expediently and consolidates amendments into
one place, making the amendment process more user-friendly and accessible. It
provides greater flexibility in drafting amendments to planning, building and
environment legislation and helps to minimise costs associated with keeping the
legislation up-to-date.
Under guidelines approved by the government, the
essential criteria for the inclusion of amendments in the bill are that the
amendments are minor or technical and non controversial, or reflect only a minor
policy change. During development of the bill, relevant government Directorates
are consulted and when necessary, industry and the community may be
consulted.
The bill forms an important part of maintaining and enhancing
the standard of ACT building, environmental and planning law. It enables
legislative amendments and repeals to be made that would generally not be of
sufficient importance to justify separate legislation. The amendments are also
inappropriate to be made as editorial amendments under the Legislation Act
2001, chapter 11 (which provides for the republication of Acts and statutory
instruments).
This is the ninth planning, building and environment
legislation amendment bill. The first bill was passed by the Assembly in June
2011. Previous bills can be accessed on the ACT Legislation Register at www.legislation.act.gov.au
.
This bill and future such bills help to keep laws as up-to-date as
possible, and to respond to technological and societal change.
Overview of Bill
The bill proposes minor policy, technical and
editorial amendments to the Building (General) Regulation 2008, the
Environment Protection Act 1997 and the Environment Protection
Regulation 2005, the Nature Conservation Act 2014, the Planning
and Development Act 2007 and the Planning and Development Regulation
2008.
Minor policy amendment to the Building (General)
Regulation
Section 6 of the Building Act 2004 permits the exemption of buildings or building work from the operation of all or part of the Building Act. Section 6 of the Building (General) Regulation 2008 exempts specified building or building work from all or specified parts of the Building Act. The exempt items are set out in Schedule 1 to the Regulation.
Schedule 1, part 1.2 of the Building (General) Regulation includes various exemptions of buildings from the operation of the entirety of the Building Act including for example, temporary buildings, pre-fabricated bus shelters and stand alone bridges. Schedule 1, Part 1.3 exempts specified building work from specified parts of the Building Act. For example, fences, walls, retaining walls, small pools, antennas and internal alterations are exempt provided the building is within specified parameters.
Section 6 of the Building (General) Regulation specifies certain standing
limitations on the exemptions from specified parts of the Act made under
Schedule 1, Part 1.3. For example, building or building work nominally exempt
under Part 1.3 is in fact not exempt if it affects:
(a) the structural
integrity of the a building;
(b) a fire-rated wall, ceiling or floor;
(c)
a ventilation or air-handling system, fire protection system or other mechanical
service;
(d) a fire-escape, emergency lift, stairway, exit or passageway to
an exit;
(e) the natural light or ventilation available to a building;
or
(f) the building in a way that reduces its compliance with the building
code to a level that is less than the minimum requirements of the code.
In 2014, the Dangerous Substances (Asbestos Safety Reform) Legislation Amendment Act 2014 (the Asbestos Reform Act) together with the Work Health and Safety (Asbestos) Amendment Regulation 2014 harmonised the Territory’s asbestos management framework with that of other model jurisdictions in accordance with the Inter-governmental Agreement for Regulatory and Operational Reform in OHS (IGA). The general outcome was that Work Health and Safety and Dangerous Substances laws regulate asbestos work rather than the Construction Occupations (Licensing) Act 2004 (COLA) and other building laws.
However, building laws needed to continue to regulate the “building integrity” aspect of building work that can adversely affect the integrity of a building, such as structural stability, fire resistance, etc even if the building work involves or may involve the handling of asbestos. In recognition of this, the Planning, Building and Environment Legislation Amendment Act 2015 (PABELAB 2015 No 1) amended various sections of the Building Act and the Building (General) Regulation, COLA and other legislation to clarify that holders of builders’ licences will be responsible for work that affects the integrity of buildings even if the work involved the handling of asbestos, such as the demolition of houses that contain residual loose asbestos. PABELAB 2015 No 1 meant that builders were responsible for ensuring building work aspects complied with building and construction laws while asbestos safety aspects of such work continued to be regulated under work health and safety laws. This result ensured there was no gap in the regulatory oversight and management of these areas.
PABELAB 2015 No 1 included a consequential amendment which omitted item 25 of schedule 1 of Part 1.3 of the Building (General) Regulation because it related to asbestos. This item 25 had exempted the handling of asbestos cement sheets of not greater than 10m² from Parts 3, 5 and 6 of the Building Act.
Clause 4 of the Bill inserts new item 27 into Schedule 1, part 1.3 of the
Building (General) Regulation. This technical amendment to the Building
Regulation reinstates the abovementioned exemption for handling asbestos cement
sheets with some additional modifications. In summary, this means that the
removal of bonded asbestos or cement sheets does not require building approval
under the Building Act. The amendments also remove references to asbestos
licensing and the restriction in size of 10m2 or less as these are no longer
relevant, as all work involving asbestos is now regulated under the Work
Health and Safety Act 2011 and due to other restrictions on the exemption
mentioned above.
The amendment facilitates the removal of broken asbestos
cement sheets, and their replacement with an equivalent material such as fibre
cement sheet, provided that work complies with relevant work safety laws
concerning asbestos work, and with the Building Code of Australia and is done in
a proper and skilful way. For example, where the asbestos sheet eaves
lining on a school building, or a house, was broken by a cricket ball, the
broken sheet could be removed and replaced with fibre cement sheet, without the
need for a building certifier, building plans, a building approval, a licensed
builder and certificate of use.
The safety risk elements of this work,
such as removing and handling bonded asbestos sheeting will continue to be
regulated by work safety laws and also other Building Act requirements,
including compliance with the Building Code and requirements for the work to be
carried out in a proper and skilful way. In particular, the exemption is limited
by the abovementioned Building (General) Regulation, s 6 (3), which prescribes
exclusions that prevent the new exemption from applying. In summary, the
exemption does not apply where the work would affect the structure of a
building, a fire rated element, or would reduce the way the building complied
with the Building Code of Australia.
This exemption is necessary because it has become apparent that the effect of
removing the exemption in PABELAB 2015 No 1 was to bring minor non-structural
maintenance works under the building approval regime. This imposed an
unnecessary administrative burden for some building work, such as works done for
school maintenance, and did not appreciably improve regulatory outcomes. The
regulatory burden of the building approval process significantly outweighs the
benefits it produces in these circumstances, considering that the work is
regulated under work safety laws that apply to asbestos work, and that there are
also additional exclusions to the exemption, to ensure safe materials and work
practices. There is no alternative to achieving this outcome other than through
legislative amendments. The reinstated exemption is in keeping with other
existing exemptions of minor building work in Part 1.3 of Schedule
1.
Minor policy amendment to the Planning and Development
Act
Development applications in the impact track require an
Environmental Impact Statement (EIS) under s 127(1) of the Planning and
Development Act. However, under s 127(2), a completed EIS is not required if an
EIS exemption is in force for the development proposal. There are a number of
documents related to an EIS exemption, including the revised exemption
application (see s 211G) ,the recent study on which the application is based
(see s 211B) and the EIS exemption itself (see s 211H). These documents are
significant for the assessment of the development proposal.
This minor
policy amendment to section 129 of the Planning and Development Act 2007
inserts additional matters that a decision maker must consider when deciding an
application for development approval for a development application. The bill
adds a requirement to consider an EIS exemption, a revised EIS application and
the recent study that the exemption is based on. These additional matters are
all relevant to the impact track development assessment process and are
particularly important for consideration of environmental impacts. This also
provides a formal mechanism to ensure assessment of avoidance, mitigation and
offset measures, as well as to inform consideration of the appropriateness of
the proposal in light of “protected matters” and other Schedule 4
items. “Protected matter” is defined in s 111A of the Planning and
Development Act and is essentially a matter protected under the Environment
Protection and Biodiversity Conservation Act 1999
(Cth).
Technical amendments to the Nature Conservation
Act
Section 259 of the Nature Conservation Act 2014 permits
the Conservator to restrict access to or close a reserve (e.g. nature reserve)
altogether by declaration (closed reserve declaration). A closed reserve
declaration may be made if the Conservator believes that continued unrestricted
public access may endanger public safety or interfere with the management of the
reserve. A closed reserve declaration is a notifiable instrument and additional
public notice of the closure must also be given, including displaying a
notice(s) in a prominent place at the reserve itself. Being a notifiable
instrument, a closure declaration previously took effect on the day after
notification (s 73(2) of the Legislation Act 2001).
The bill
amends this provision to allow a closed reserve declaration to commence on a day
or at a time earlier than its notification day. This allows the closed reserve
declaration to commence, if required, at the time it is made, with public notice
to then take place in the form of notification on the Legislation Register,
public notice on an ACT Government website and/or publication in a daily
newspaper, and signs erected at the reserve. This amendment deals with the
practical difficulty of needing to urgently close a nature reserve, but having
to wait until the closed reserve declaration became effective on the day after
notification. For example, a reserve may need to be closed urgently to prevent
risk to public safety from a sudden bushfire, earthquake, snowfall or high
winds.
The amendment also expands the defence available to the offence of
entering a closed reserve under s 260, by adding an element to the defence of
having no reasonable grounds for suspecting that a closed reserve declaration
was in force. This defence will operate in circumstances where an urgent closed
reserve declaration is made, and commences immediately, and a person is present
in the reserve or becomes present in the reserve, without having any reasonable
grounds for suspecting that a declaration is in operation.
Part
4.4 of the Nature Conservation Act sets out the process for including,
transferring or omitting items from lists as set out in s 80 of the Act
(a)
the threatened native species list; or
(b) the threatened ecological
communities list; or
(c) the key threatening processes list.
The Act
includes a number of transitional provisions to, among other things, permit the
incorporation of existing declarations (lists) of threatened, endangered or
vulnerable species under the former 1980 Act to be carried across to the 2014
Act. The relevant transitional provisions are ss 402-405 of the Act. In the case
of key threatening processes, there is no existing list to be transitioned.
The bill includes a number of amendments that permit an initial key
threatening processes list to be made. This has been done by amending the
definition of a key threatening processes list in s 75 to include a list
made under new s 79A. New section 79A permits the Minister to make a key
threatening processes list in accordance with the part (Part 4.3). This allows
the Minister to make an initial key threatening processes list, rather than
being limited to including an item on an existing list, which does not in fact
exist. New ss 72A and 79A to 79H essentially replicate the process for adding an
item to an existing list found in ss 83-88, including public or scientific
committee nomination, public consultation, listing assessment and listing
advice, and a Ministerial decision. The result is that an initial list of key
threatening processes can be made under the amended Part 4.3 (see s 72A and
79A-79H). Any additional items can be included, transferred, or omitted, from
the initial list through the existing process set out in Part
4.4.
Technical amendments to the Planning and Development
Act
Section 147A of the Planning and Development Act requires the planning and
land authority to refer certain development applications to the Conservator for
advice. The authority must refer applications if satisfied that the
development application is likely to have a significant adverse environmental
impact on a protected matter (as defined by s 111A). The advice of the
Conservator must include an assessment of whether the proposed development is
likely to have a significant adverse environmental impact on a protected matter
and, if so, advice about suitable offsets for the proposed development (refer s
318 of the Nature Conservation Act). Development approval for such a
matter must not be given unless the approval is consistent with the advice of
the Conservator (refer s 128(1)(b)(vi)). The Minister is similarly bound
by Conservator advice in this circumstance (s 128(2)) but has an ability to
depart from the advice in the limited circumstances set out in s 128(2)(a) and
(b).
In providing advice on a development application referred to the
Conservator under section 147A, the Conservator may also provide advice in
relation to the development application that is not related to the protected
matter.
This amendment is to make it clear that the authority is
bound to comply with the advice of the Conservator in relation to the protected
matter only. Advice on the development application that is not related to
the protected matter will continue to have the same status as advice from the
Conservator or other referral agencies, that is, the advice must be considered
and must be adhered to unless the authority is satisfied of the matters set out
in s 128(3) that is the approval decision is consistent with the objects of the
Territory Plan and that all relevant guidelines and realistic alternatives and
options have been considered. The decision maker is still required to take
account of the advice on the non-protected matter under s 129(e) but is not
bound by it.
The bill also amends s 211C of the Planning and Development
Act to clarify the period of public consultation on an application for exemption
from the requirement to complete an environmental impact statement (EIS).
Section 211C(2)(a)(ii) previously required the public consultation period on the
EIS exemption application to commence when notified on the legislation register.
The wording of this provision presented administrative and uncertainty
difficulties as it can be hard to anticipate the notification date. The
amendment addresses this administrative issue by allowing a consultation period
to be stated in the consultation notice, which will still require a period of
not less than 15 working days, rather than commencing after
notification.
The bill also makes a technical amendment to s 131 of the
Planning and Development Act to clarify that where a matter is referred to the
Commonwealth Minister, the ten day period for comment by the Commonwealth
Minister is added to the time for decision on a development application. This is
necessary because the decision is not able to made until the comments from the
Commonwealth Minister are received and the ten day period has expired.
Editorial amendments to the Nature Conservation Act, Planning
and Development Regulation and Environment Protection Act
The bill
makes an editorial amendment to the Nature Conservation Act section 6 (2) (h).
The amendment removes a redundant reference to the definition of ecologically
sustainable development in an amended version of the Environment Protection
Act and inserts that definition into the Nature Conservation Act. The definition
of ecologically sustainable development previously sat in s 2(2) of the
Environment Protection Act. That Act has since been amended, and the definition
of ecologically sustainable development no longer sits in this provision,
although the content of the provision remains in the Act, albeit in different
sections. This amendment reproduces the definition of ecologically sustainable
development into the Nature Conservation Act to remove the need to link to the
Environment Protection Act. The amendment does not change the definition of
ecologically sustainable development.
A second editorial amendment is
made to the Nature Conservation Act that removes Note 3 in section 159. This
note became redundant with the commencement of the Nature Conservation Act
and refers to repealed processes.
An editorial amendment is also
made to the Planning and Development Regulation to amend an incorrect section
reference in a title. Section 25 of the regulation incorrectly referred to s
139(2)(i) and this has been replaced with the correct reference to s
139(2)(j).
The bill also makes an editorial amendment to s 25 of the
Environment Protection Act. This section lists the organisations that must be
sent copies of draft environmental protection policies in the consultation
process. The two listed organisations have recently undergone a name change and
merger respectively. As a result, the names of the entities required updating.
This has been achieved through substituting s 25 of the Environment Protection
Act with a new section stating that entities are prescribed in regulation. A new
regulation is then created that prescribes the two entities according to their
new names.
Human Rights
Clause 4 of the Bill inserts new
item 27 into Schedule 1, part 1.3 of the Building (General) Regulation. This
amendment reinstates an exemption that had been removed by PABELAB 2015 No 1.
The amendment is such that building approval will no longer be required for
certain building works involving the handling of bonded asbestos or an
equivalent sheet material not containing asbestos. The effect of this is to
remove the requirement for decisions under the Building Act such as the approval
of plans and granting building approval by the building certifier.
This
measure might be considered to potentially impact on the right to a fair trial
in s 21 of the Human Rights Act 2004. This could be on the basis
that the exemption of specified building work from statutory approval processes
reduces the scope for review of decisions leading up to the physical undertaking
of the building work. The removal of the requirement for building approval will
mean that the decision to grant or not grant approval will not be subject to
review by the Supreme Court either under the Administrative Decisions
(Judicial Review) Act 1989 or the inherent jurisdiction of the Court.
To the extent that this exemption does impact on the right to a fair
trial, it is considered that the impact is reasonable, proportional and
justified and as such is permissible, consistent with s 28 of the Human Rights
Act, taking into account the matters set out in s 28(2).
The amendment
is justified consistent with s 28(2)(a) of the Human Rights Act because the
limitation has little practical effect on the ability of the proponent of the
building work to seek review. If the work in the removal of cement sheets is
exempt from building approval under the proposed exemption then the work can
proceed as sought by the proponent. If the work is considered to be not exempt
then building approval is required and the decision processes and outcomes
associated with this are then potentially subject to Supreme Court review. It
should also be noted that the amendment works to benefit of the proponent by
removing the need to get building approval in the first place. In exempting
these matters from building approval, this would also remove any existing
potential for third parties to seek Supreme Court review of a decision to grant
building approval. However, the ability of third parties to seek judicial
review of decisions associated with the removal of such sheets would appear
limited, given in practical terms the limited potential for such decisions on
cement sheets to have any effect on third parties.
The limitation is
consistent with 28(2)(b) of the Human Rights Act because the measure is
important to remove unnecessary approval processes and associated red tape that
had no significant public benefit, as noted above.
In terms of section
28(2)(c) of the Human Rights Act it is noted that the limitation is itself
circumscribed as the risk elements associated with these actions are
appropriately regulated through other provisions of the Building Act that still
apply, and through work safety laws. In particular, with respect to actions
involving the removal of asbestos cement sheets, these actions will continue to
be required to comply with asbestos handling requirements in the Work Health
and Safety Act 2011 and this continuing requirement is not affected in any
way by the proposed amendment. Further, the exemption is also limited by
requirements to comply with the Building Code of Australia and for work to be
carried out in a proper and skilful way.
In terms of sections 28(2)(d)
of the Human Rights Act, the proposed amendment achieves the outcomes sought in
a direct manner (i.e. reinstates the exemption from building approval so
removing unnecessary red tape).
In terms of section 28(2)(e) of the
Human Rights Act there is no practical alternative to achieving this outcome
other than by amending the provision to reinstate the relevant exemption from
building approval.
Clause 15 amends section 259 of the Nature
Conservation Act. This amendment will allow for a closed reserve declaration to
commence on a day or a time a time earlier than its notification day. This
amendment has the potential to impact on the human right of freedom of movement
(see s13 of the Human Rights Act). It is arguable that this measure impacts on
the right of freedom of movement in that it will permit the immediate closure of
nature reserves to public access in contrast to the existing law which requires
the closure instrument to be notified on the legislation register before taking
effect.
To the extent that this exemption does impact on the right of
freedom of movement, it is considered that the impact is reasonable,
proportional and justified and as such is permissible consistent with section 28
of the Human Rights Act, taking into account the matters set out in section
28(2) of that Act.
The amendment is justified, taking into account
s28(2)(a) and (c) of the Human Rights Act because in this case the existing
right to freedom of movement in relation to nature reserves is already subject
to restriction by decision of the Conservator under section 259 of the Nature
Conservation Act. The amended provision does not make any substantive change to
the power to close reserves. The amended provision affects only the timing of
when a declaration can commence. The proposed measure does have the potential
to allow for a declaration to come into force when persons are already present
in a reserve. There is also the potential for persons to enter the reserve soon
after the declaration is made but before the closure is publicly notified. This
urgent closure may be necessary from time to time to permit Conservation
officers to immediately require persons on the reserve to leave without first
having to wait for the decision to be publicly notified. To address this
situation, the bill includes a defence provision (clause 14 substituting s
260(3)). This provision will serve to protect persons from having committed an
offence where they could not reasonably have known that a declaration was in
force, or where they have a reasonable excuse for being in the closed nature
reserve. For this reason, the limitation on freedom of movement is mitigated by
including a defence of reasonable excuse to the offence of being present in a
nature reserve while a declaration is in force. Further, there is still a
requirement for the declaration instrument to be notified on the Legislation
Register as soon as practical after the instrument is made, for public notice to
be given and for signage to be placed at the reserve.
In terms of
section 28(2)(b) of the Human Rights Act, the measure is important to permit the
closure of nature reserves in urgent circumstances such as when there is a
bushfire, flood or other imminent threat to public safety.
In terms of
section 28(2)(d) of the Human Rights Act, the proposed measure does permit the
immediate closure of nature reserves as might be required in urgent
circumstances and as such bears a direct relationship between the limitation and
its purpose.
In terms of section 28(2)(e) of the Human Rights Act, there
is no practical alternative measure to achieve this outcome other than by
legislative amendment of the type sought.
Outline of provisions
Clause 1 — Name of Act
This clause names the Act as the
Planning Building and Environment Legislation Amendment Act 2015 (No
2).
Clause 2 — Commencement
This clause provides that
the Act commences on the day after its notification day.
Clause 3
— Legislation amended
This clause states the Act amends the
legislation mentioned in schedule 1, that is:
• Building
(General) Regulation 2008
• Environment Protection Act
1997
• Environment Protection Regulation
2005
• Nature Conservation Act 2014
• Planning
and Development Act 2007
• Planning and Development Regulation
2008.
Part 2 Building (General) Regulation
2008
Clause 4 — Exempt buildings and building works Schedule
1, part 1.3, new item 27
Clause 4 inserts new item 27 into Schedule 1,
part 1.3 of the Building (General) Regulation.
New item 27 reinstates an
exemption for handling asbestos cement sheets and equivalent sheet material not
containing asbestos, which had unintended consequences when omitted during
recent amendments.
The removal of this exemption brought minor
non-structural maintenance works under the building approval regime. This
imposed an unnecessary administrative burden on some building work, such as that
done by school maintenance, and did not appreciably improve regulatory outcomes
as the risk elements of this work, such as removing and handling bonded asbestos
sheeting, continue to be regulated by work safety laws and other Building Act
requirements, including compliance with the Building Code and for the work to be
carried out in a proper and skilful way.
The amendment also removes
references to asbestos licensing and to remove the restriction in size of
10m2 or less as these are no longer relevant, as all work involving
asbestos is now regulated under the Work Health and Safety Act 2011 and
because of other restrictions to the exemption mentioned
above.
Part 3 Environment Protection Act 1997
Clause
5 — Consultation on draft environment protection policy Section 25
(5)
This clause substitutes new s 25(5). This clause adopts a new
approach by prescribing by regulation the entities to which the Environment
Protection Authority must send a copy of a draft policy. The approach of
prescribing the names of entities in regulation gives flexibility to easily
amend the prescribed entities should their names change again in the
future.
Part 4 Environment Protection Regulation
2005
Clause 6 — New Section 70
This clause inserts
new section 70. This clause prescribes the entities referred to in clause 5.
The entities prescribed in new section 70 are the new names for the
entities previously listed in s25 of the Environment Protection Act 1997
prior to this amendment.
Part 5 Nature Conservation Act
2014
Clause 7 — Objects of Act Section 6 (2) (h)
This
clause substitutes new s 6(2)(h) that maintains the object of promoting the
principles of ecologically sustainable development, but removes the reference to
the definition of the term in the repealed s 2(2) of the Environment
Protection Act 1997.
The definition of ecologically sustainable
development previously sat in s 2(2) of the Environment Protection Act. That Act
has since been amended, and the definition of ecologically sustainable
development no longer sits in this provision, although the content of the
provision remains in the Act, albeit in different sections. This amendment
reproduces the definition of ecologically sustainable development into the
Nature Conservation Act to remove the need to link to the Environment Protection
Act. The amendment does not change the definition of ecologically sustainable
development.
Clause 8 — New Section 6 (4)
Clause 8
inserts new s 6(4) which contains the definition of ecologically sustainable
development referred to in clause 7 above, and that previously sat in repealed s
2(2) of the Environment Protection Act 1997.
New s 6(4) also
includes definitions of new s 6(4)(a) the precautionary principle, and new s
6(4)(b) the inter-generational equity principle. The definitions of these terms
are the same as those found in s 3D of the Environment Protection Act
1997. Clauses 7 and 8 have not altered the definition of ecologically
sustainable development; they have merely replicated existing definitions from
the Environment Protection Act 1997 into the Nature Conservation Act
2014.
Clause 9 — New section 72A
Clause 9 inserts
new s 72A which includes definitions for terms in Part 4.3. These definitions
relate to elements of the process for making an initial key threatening
processes list set out in clauses 10-12 below.
Clause 10 — What
is a key threatening processes list?
Section 75, definition of
key threatening processes list
Clause 9 substitutes s 75 of the
Nature Conservation Act 2014 to amend the definition of key
threatening processes list to include a key threatening processes list made
under s 79A.
This clause is part of a suite of amendments to the Nature
Conservation Act (clauses 9 to 11 and 15) to clarify that an initial list of
threatening processes can be made, as a previous list was not made under the
repealed Nature Conservation Act 1980 and could not be transitioned, as
was the case with the threatened native species list and the threatened
ecological communities list.
Clause 11 — Key threatening
processes list Section 76
Clause 10 omits s 76.
Omitted s 76 is
redundant given other amendments to the process for making a key threatening
processes list (see clause 11 below).
Clause 12 — New Sections
79A to 79H
Clause 11 inserts new ss 79A to 79H into part 4.3 to clarify
that an initial list of key threatening processes can be made.
New s 79A
requires that the Minister make a key threatening processes list in accordance
with this part (Part 4.3). This clarifies that the Minister may make an initial
key threatening processes list, rather than being limited to including an item
on an existing key threatening processes list, which does not exist. New ss 79A
to 79H essentially replicate the process for adding an item to an existing list
found in
ss 81-88, including public or scientific committee nomination,
public consultation, listing assessment and listing advice, and a Ministerial
decision.
Clause 13 — Definitions—pt 4.4 Section 80, new
definitions
Clause 13 inserts new definitions for items in Part 4.4 to
distinguish these items from the new definitions inserted by clause 9
above.
New clause 13 definitions are included to distinguish the process
for making an initial key threatening processes list, which is inserted by
clauses 10-12, from the process for including, transferring or omitting an item
from an existing list found in current Part 4.4 of the Nature Conservation
Act.
Clause 14 — What is a draft controlled native species
management plan?
– ch 7 Section 159(1) note 3
Clause
11 omits s 159(1) note 3 as the note is redundant as a result of amendments
contained in the Nature Conservation Act 2014.
Clause 15
— Conservator may close reserve New Section 259 (5)
Clause 12
inserts new s 259(5). This new section allows a closed reserve declaration to
commence on a day or at a time earlier than its notification day.
This
section allows for the urgent closure of nature reserves to protect public
safety and means that a declaration can commence operation when it is made
rather than having to wait until the day after the notification day as per s 73
of the Legislation Act 2001.
Clause 16 —
Offence—enter closed reserve Section 260 (3), except note
Clause 14
substitutes a new s 260 (3) to include a new element to the defence against an
offence under s 260.
Substituted clause 14 expands on the defence
available to an offence under s 260 by adding an element to the defence of
having no reasonable grounds for suspecting that a closed reserve declaration
was in force. The circumstances where this element of the defence will operate
include where an urgent closure declaration is made and a person is already
present in the reserve, or where a person enters the reserve after a declaration
is made but before officers are available to give public notice of the
declaration and place signage at the reserve.
Clause 17
— Threatening processes to be key threatening processes
Section
405
Clause 13 omits s 405 as it is a transitional provision for an
existing list of threatening processes that was never made under the repealed
Nature Conservation Act 1980.
Clause 18 — Dictionary,
definitions of listing advice, listing assessment and public
consultation notice
Clause 18 substitutes new definitions for the
terms listing advice, listing assessment and public
consultation notice as part of the suite of amendments that will permit the
Minister to make an initial key threatening processes list (see clauses 9-13
above), as opposed to including an item on an existing list (see existing Part
4.4 of the Nature Conservation Act).
Part 6 Planning and
Development Act 2007
Clause 19 — Impact track—when
development approval must not be given Section 128 (1) (b) (vi)
Clause 14
inserts the phrase ‘that relates to the protected matter’ after the
word ‘Conservator’ in s 128 (1) (b) (vi).
This amendment
clarifies that where a development application is referred to the Conservator
for advice because it is likely to have a significant adverse environmental
impact on a protected matter, the advice given by the Conservator in relation to
a development application is only binding in relation to the protected matter.
“Protected matter” is defined in s 111A of the Planning and
Development Act. Development applications involving protected matters must be
referred to the Conservator under s 147A of the Planning and Development
Act. The Conservator must provide advice on the development application as a
whole, consistent with s 149 of the Planning and Development Act. Under s 129
(e), the decision maker on the development application must take into account
all of the advice received from the Conservator; however, this amendment
clarifies that the decision maker is only bound by the advice that relates to
the protected matter.
Clause 20 — Section 128 (2A)
Clause
15 inserts new s 128 (2A) that states that s 128 (2) does not apply if a
development approval is inconsistent with a part of the Conservator’s
advice that relates only to ‘non-protected’ matters.
This
clause relates to clause 14 in clarifying that a decision maker on a development
application is only bound by advice from the Conservator on protected
matters.
Clause 21 — Impact track – considerations when
deciding development approval New Section 129 (k)
Clause 16 inserts new s
129 (k) which adds new considerations when deciding development
approval.
New s 129 (k) operates where an Environmental Impact Statement
(EIS) exemption has been granted under s 211H of the Planning and Development
Act in relation to the proposed development. The new section states that the EIS
exemption, the recent study on which the exemption is based and the revised EIS
exemption application under s 211G of the Planning and Development Act must all
be considered. This ensures proper consideration of environmental impacts in the
impact track development assessment process.
Clause 22 —
Impact track – time for decision on application
New Section 131
(2)
Clause 17 inserts new s 131 (2) which clarifies the time for decision
on a development application if the decision maker has referred the proposed
decision to the Commonwealth Minister under s 127A (2) of the Planning and
Development Act.
New s 131 (2) clarifies that the 10 day period in which
the Commonwealth Minister can provide comment is added to the time period for
making a decision, In effect, if the decision is referred to the Commonwealth
Minister, the time period for decision will be extended by 10
days.
Clause 23 — EIS exemption application – public
consultation
Section 211C (2) (a) (ii)
Clause 18 substitutes a
new s 211C (2) (a) (ii) to clarify that a consultation period can be a period
stated in a consultation notice.
Substituted s 211C (2) (a) (ii) allows a
consultation period to be that which is stated in the consultation notice, which
requires a minimum 15 day period, rather than commencing after notification.
This addresses an administrative difficulty of having to anticipate the
notification date when determining the consultation
period.
Part 7 Planning and Development
Regulation 2008
Clause 24 — Section 25 heading
Clause
20 substitutes the s 25 heading with a new heading to address an editorial
error. This heading referred to the incorrect s 139 (2) (i) when it should refer
to s 139 (2) (j).