Commonwealth of Australia Bills

[Index] [Search] [Download] [Related Items] [Help]


This is a Bill, not an Act. For current law, see the Acts databases.


BUILDING AND CONSTRUCTION INDUSTRY (CONSEQUENTIAL AND TRANSITIONAL PROVISIONS) BILL 2013

 

 

 

2013 

 

The Parliament of the 

Commonwealth of Australia 

 

HOUSE OF REPRESENTATIVES 

 

 

 

 

Presented and read a first time 

 

 

 

 

Building and Construction Industry 

(Consequential and Transitional 

Provisions) Bill 2013 

 

No.      , 2013 

 

(Employment) 

 

 

 

A Bill for an Act to deal with consequential and 

transitional matters arising from the enactment of 

the Building and Construction Industry (Improving 

Productivity) Act 2013, and for related purposes 

   

   

 

 

No.      , 2013 

Building and Construction Industry (Consequential and Transitional 

Provisions) Bill 2013 

i 

 

Contents 

Short title ........................................................................................... 1

 

Commencement ................................................................................. 1

 

Schedule(s) ........................................................................................ 2

 

Schedule 1--Repeal and amendments

 

3

 

Part 1--Repeal of the Fair Work (Building Industry) Act 2012

 

3

 

Fair Work (Building Industry) Act 2012

 

3

 

Part 2--Consequential amendments

 

4

 

Administrative Decisions (Judicial Review) Act 1977

 

4

 

Fair Work (Registered Organisations) Act 2009

 

4

 

Jurisdiction of Courts (Cross-Vesting) Act 1987

 

5

 

Part 3--Amendments relating to privacy

 

6

 

Building and Construction Industry (Improving Productivity) Act 

2013

 

6

 

Schedule 2--Transitional provisions

 

7

 

 

 

 

 

No.      , 2013 

Building and Construction Industry (Consequential and Transitional 

Provisions) Bill 2013 

1 

 

A Bill for an Act to deal with consequential and 

transitional matters arising from the enactment of 

the Building and Construction Industry (Improving 

Productivity) Act 2013, and for related purposes 

The Parliament of Australia enacts: 

1  Short title 

 

  This Act may be cited as the Building and Construction Industry 

(Consequential and Transitional Provisions) Act 2013

2  Commencement 

 

(1)  Each provision of this Act specified in column 1 of the table 

10 

commences, or is taken to have commenced, in accordance with 

11 

   

   

 

 

2 

Building and Construction Industry (Consequential and Transitional 

Provisions) Bill 2013 

No.      , 2013 

 

column 2 of the table. Any other statement in column 2 has effect 

according to its terms. 

 

Commencement information 

Column 1 

Column 2 

Column 3 

Provision(s) 

Commencement 

Date/Details 

1.  Sections 1 to 3 

and anything in 

this Act not 

elsewhere covered 

by this table 

The day this Act receives the Royal Assent. 

 

2.  Schedule 1, 

Parts 1 and 2 

At the same time as section 3 of the Building 

and Construction Industry (Improving 

Productivity) Act 2013 commences. 

 

3. Schedule 1, 

Part 3 

The later of: 

(a) immediately after the commencement of 

subsection 106(7) of the Building and 

Construction Industry (Improving 

Productivity) Act 2013; and 

(b) the beginning of 12 March 2014. 

 

4.  Schedule 2 

At the same time as section 3 of the Building 

and Construction Industry (Improving 

Productivity) Act 2013 commences. 

 

Note:  

This table relates only to the provisions of this Act as originally 

enacted. It will not be amended to deal with any later amendments of 

this Act. 

 

(2)  Any information in column 3 of the table is not part of this Act. 

Information may be inserted in this column, or information in it 

may be edited, in any published version of this Act. 

3  Schedule(s) 

10 

 

  Each Act that is specified in a Schedule to this Act is amended or 

11 

repealed as set out in the applicable items in the Schedule 

12 

concerned, and any other item in a Schedule to this Act has effect 

13 

according to its terms. 

14 

Repeal and amendments  Schedule 1 

Repeal of the Fair Work (Building Industry) Act 2012  Part 1 

 

 

No.      , 2013 

Building and Construction Industry (Consequential and Transitional 

Provisions) Bill 2013 

3 

 

Schedule 1

--

Repeal and amendments 

Part 1

--

Repeal of the Fair Work (Building Industry) 

Act 2012 

Fair Work (Building Industry) Act 2012 

1  The whole of the Act 

Repeal the Act. 

Schedule 1  Repeal and amendments 

Part 2  Consequential amendments 

 

 

4 

Building and Construction Industry (Consequential and Transitional 

Provisions) Bill 2013 

No.      , 2013 

 

Part 2

--

Consequential amendments 

Administrative Decisions (Judicial Review) Act 1977 

2  Paragraph (a) of Schedule 1 

Omit "or the Fair Work (Building Industry) Act 2012", substitute ", the 

Fair Work (Building Industry) Act 2012 or the Building and 

Construction Industry (Improving Productivity) Act 2013". 

Fair Work (Registered Organisations) Act 2009 

3  Subparagraphs 337A(b)(iii) and (iv) 

Repeal the subparagraphs, substitute: 

 

(iii)  the Australian Building and Construction Commissioner 

10 

referred to in subsection 15(1) of the Building and 

11 

Construction Industry (Improving Productivity) Act 

12 

2013

13 

 

(iiia)  a Deputy Australian Building and Construction 

14 

Commissioner referred to in subsection 15(2) of the 

15 

Building and Construction Industry (Improving 

16 

Productivity) Act 2013

17 

 

(iv)  an Australian Building and Construction Inspector 

18 

referred to in subsection 66(1) of the Building and 

19 

Construction Industry (Improving Productivity) Act 

20 

2013

21 

4  Saving provision 

22 

Despite the repeal of subparagraphs 337A(b)(iii) and (iv) of the Fair 

23 

Work (Registered Organisations) Act 2009 by this Act, those 

24 

subparagraphs continue to apply after this item commences in relation 

25 

to disclosures to the Director or a Fair Work Building Industry 

26 

Inspector before this item commences. 

27 

Repeal and amendments  Schedule 1 

Consequential amendments  Part 2 

 

 

No.      , 2013 

Building and Construction Industry (Consequential and Transitional 

Provisions) Bill 2013 

5 

 

Jurisdiction of Courts (Cross-Vesting) Act 1987 

5  Paragraph 4(4)(aba) 

Repeal the paragraph, substitute: 

 

(aba)  the Building and Construction Industry (Improving 

Productivity) Act 2013; or 

Schedule 1  Repeal and amendments 

Part 3  Amendments relating to privacy 

 

 

6 

Building and Construction Industry (Consequential and Transitional 

Provisions) Bill 2013 

No.      , 2013 

 

Part 3

--

Amendments relating to privacy 

Building and Construction Industry (Improving Productivity) 

Act 2013 

6  Subsection 106(7) 

Omit "law for the purposes of paragraph (1)(d) of Information Privacy 

Principle 11 in section 14 of the Privacy Act 1988", substitute "this Act 

for the purposes of paragraph 6.2(b) of Australian Privacy Principle 6". 

Transitional provisions  Schedule 2 

   

 

 

No.      , 2013 

Building and Construction Industry (Consequential and Transitional 

Provisions) Bill 2013 

7 

 

Schedule 2

--

Transitional provisions 

   

1  Definitions 

In this Schedule: 

Commission means the Australian Building and Construction 

Commission (previously named the Office of the Fair Work Building 

Industry Inspectorate) as continued in existence after the transition time. 

Note: 

Section 29 of the new Act provides for the Office of the Fair Work Building Industry 

Inspectorate to continue in existence under the name of the Australian Building and 

Construction Commission. 

10 

Commission transition means the transition from the old Office to the 

11 

Commission. 

12 

new Act means the Building and Construction Industry (Improving 

13 

Productivity) Act 2013

14 

old Act means the Fair Work (Building Industry) Act 2012

15 

old Office means the Office of the Fair Work Building Industry 

16 

Inspectorate as established and in existence immediately before the 

17 

transition time. 

18 

transition time means the commencement of section 3 of the new Act. 

19 

2  Application of Act 

20 

(1) 

The new Act applies (subject to this item and this Schedule) in relation 

21 

to any building work that is performed, any action taken, or any 

22 

omission that occurs, after the transition time. 

23 

Unenforceable project agreements 

24 

(2) 

Section 59 of the new Act (project agreements not enforceable) applies 

25 

in relation to agreements entered into after the transition time. 

26 

Powers to obtain information 

27 

(3) 

Chapter 7 of the new Act (powers to obtain information), and any other 

28 

provision of that Act to the extent that the provision relates to that 

29 

Chapter, apply in relation to any contravention or alleged contravention 

30 

of the Building and Construction Industry Improvement Act 2005 (the 

31 

BCII Act) or the old Act that occurs before the transition time. 

32 

Schedule 2  Transitional provisions 

   

 

 

8 

Building and Construction Industry (Consequential and Transitional 

Provisions) Bill 2013 

No.      , 2013 

 

(4) 

The table translates terms in Chapter 7 of the new Act (and in any other 

provision of the new Act to the extent that the provision relates to that 

Chapter) for the purposes of this item. 

 

Translations of terms 

Item 

A reference to this term ...  

is taken to be a reference to this 

term ...  

a designated building law (within 

the meaning of the new Act) 

a designated building law (within 

the meaning of the BCII Act or the 

old Act, as the case requires). 

this Act 

the BCII Act or the old Act, as the 

case requires. 

building work (within the meaning 

of the new Act) 

building work (within the meaning 

of the BCII Act or the old Act, as the 

case requires). 

(5) 

To avoid doubt, a person who is an inspector (within the meaning of the 

new Act) may exercise powers under Chapter 7 of the new Act in 

relation to an investigation of a contravention or alleged contravention 

of the BCII Act or the old Act even if the person began the 

investigation, under those Acts, before the transition time. 

Intervening and making submissions in proceedings 

10 

(6) 

Sections 109 and 110 of the new Act apply in relation to any proceeding 

11 

before a court or the FWC, even if the proceeding began before the 

12 

transition time. 

13 

3  Annual reports 

14 

(1) 

If, in relation to a financial year ending at or before the transition time, 

15 

the Director has not, by the transition time, prepared and given to the 

16 

Minister a report under section 14 of the old Act on the performance of 

17 

the Director's functions and the exercise of the Director's powers 

18 

during the financial year, then the ABC Commissioner must, as soon as 

19 

practicable after the transition time, prepare and give to the Minister a 

20 

report in accordance with that section on those functions and powers 

21 

during that financial year. 

22 

(2) 

If the first financial year to end after the transition time includes a 

23 

period before the transition time, the report under section 20 of the new 

24 

Transitional provisions  Schedule 2 

   

 

 

No.      , 2013 

Building and Construction Industry (Consequential and Transitional 

Provisions) Bill 2013 

9 

 

Act in relation to that financial year must also cover the performance of 

the Director's functions and the exercise of the Director's powers 

during that period. 

4  Continuation of appointment of Director 

(1) 

Subitem (2) applies to the person who, immediately before the 

transition time, holds office as the Director. 

(2) 

The instrument appointing the person to that office has effect, after the 

transition time, as if it were an instrument made by the Minister under 

subsection 21(1) of the new Act appointing the person, for the 

remainder of the period of the person's appointment to that office, to the 

10 

office of the ABC Commissioner. 

11 

(3) 

A determination, in relation to the Director, that is in force immediately 

12 

before the transition time under the Remuneration Tribunal Act 1973 

13 

has effect after the transition time as if it were a determination in 

14 

relation to the ABC Commissioner. 

15 

5  Termination of appointments of certain persons 

16 

(1) 

This item applies to a person who, immediately before the transition 

17 

time, holds office as either of the following: 

18 

 

(a)  a member of the Fair Work Building Industry Inspectorate 

19 

Advisory Board (including the Chair of the Board); 

20 

 

(b)  the Independent Assessor. 

21 

(2) 

The person ceases to hold that office at the transition time. 

22 

(3) 

Nothing in this item prevents the person being appointed to an office 

23 

under the new Act. 

24 

6  Staff of old Office 

25 

(1) 

The Commission transition does not affect the continuity of the 

26 

employment, or the terms and conditions of employment (including 

27 

under any enterprise agreement), of the persons who, immediately 

28 

before the transition time, are engaged as staff under section 26K of the 

29 

old Act. 

30 

(2) 

Those persons are taken, after the transition time, to be staff under 

31 

section 30 of the new Act. 

32 

Schedule 2  Transitional provisions 

   

 

 

10 

Building and Construction Industry (Consequential and Transitional 

Provisions) Bill 2013 

No.      , 2013 

 

7  Consultants to Director 

(1) 

The Commission transition does not affect the continuity of the 

engagement, or the terms and conditions of engagement, of the persons 

who, immediately before the transition time, are engaged as consultants 

to the Director under section 26M of the old Act. 

(2) 

Those persons are taken, after the transition time, to be engaged as 

consultants to the ABC Commissioner under section 32 of the new Act. 

8  Continuation of designation of Federal Safety 

Commissioner 

 

An instrument: 

10 

 

(a)  that is in force under section 29 of the old Act immediately 

11 

before the transition time; and 

12 

 

(b)  that designates a position in the Department as the position of 

13 

Federal Safety Commissioner; 

14 

is taken, after the transition time, to have been made under section 37 of 

15 

the new Act. 

16 

9  Preserving regulations relating to the Federal Safety 

17 

Commissioner 

18 

(1) 

Regulations made by the Governor-General for the purposes of 

19 

paragraphs 30(h) and 32(1)(c) of the old Act that are in force 

20 

immediately before the transition time continue in force after that time 

21 

as if the regulations were rules made by the Minister for the purposes of 

22 

paragraphs 38(e) and 40(1)(c) of the new Act. 

23 

(2) 

The table translates terms in the regulations for the purposes of this 

24 

item. 

25 

 

26 

Translations of terms in regulations 

Item 

A reference to this term ...  

is taken to be a reference to this 

term ...  

paragraph 30(h) of the old Act 

paragraph 38(e) of the new Act. 

the Federal Safety Commissioner 

(within the meaning of the old Act) 

the Federal Safety Commissioner 

(within the meaning of the new Act). 

occupational health and safety 

work health and safety (within the 

Transitional provisions  Schedule 2 

   

 

 

No.      , 2013 

Building and Construction Industry (Consequential and Transitional 

Provisions) Bill 2013 

11 

 

Translations of terms in regulations 

Item 

A reference to this term ...  

is taken to be a reference to this 

term ...  

(within the meaning of the old Act) 

meaning of the new Act). 

an accredited person (within the 

meaning of the old Act) 

an accredited person (within the 

meaning of the new Act). 

paragraph 32(1)(c) of the old Act 

paragraph 40(1)(c) of the new Act. 

(3) 

Subitem (1) does not prevent the repeal of those regulations. 

10  Consultants to old Federal Safety Commissioner 

(1) 

The Commission transition does not affect the continuity of the 

engagement, or the terms and conditions of engagement, of the persons 

who, immediately before the transition time, are engaged as consultants 

to the Federal Safety Commissioner under section 34 of the old Act. 

(2) 

Those persons are taken, after the transition time, to be engaged as 

consultants to the Federal Safety Commissioner under section 42 of the 

new Act. 

11  Preserving the accreditation scheme 

10 

(1) 

Regulations made by the Governor-General for the purposes of 

11 

section 35 of the old Act that are in force immediately before the 

12 

transition time continue in force after that time as if the regulations were 

13 

rules made by the Minister for the purposes of section 43 of the new 

14 

Act. 

15 

(2) 

The table translates terms in the regulations for the purposes of this 

16 

item. 

17 

 

18 

Translations of terms in regulations 

Item 

A reference to this term ...  

is taken to be a reference to this 

term ...  

the Federal Safety Commissioner 

(within the meaning of the old Act) 

the Federal Safety Commissioner 

(within the meaning of the new Act). 

a Federal Safety Officer (within the 

meaning of the old Act) 

a Federal Safety Officer (within the 

meaning of the new Act). 

building work (within the meaning 

building work (within the meaning 

Schedule 2  Transitional provisions 

   

 

 

12 

Building and Construction Industry (Consequential and Transitional 

Provisions) Bill 2013 

No.      , 2013 

 

Translations of terms in regulations 

Item 

A reference to this term ...  

is taken to be a reference to this 

term ...  

of the old Act) 

of the new Act). 

a constitutional corporation 

a constitutional corporation, the 

Commonwealth or a Commonwealth 

authority. 

section 63 of the old Act 

Division 3 of Part 3 of Chapter 7 of 

the new Act. 

subsection 35(1), (2) or (4) of the 

old Act 

subsection 43(1), (2) or (4) of the 

new Act. 

(3) 

Subitem (1) does not prevent the repeal of those regulations. 

12  Examination notices issued before commencement 

(1) 

The repeal by this Act of section 47 of the old Act does not affect the 

continuity of any examination notice issued under that section before 

the transition time. 

(2) 

For things that occur after the transition time in relation to an 

examination notice that is issued before that time, the following 

provisions (as in force immediately before that time) continue to apply 

as if references in those provisions or in that examination notice to the 

Director were references to the ABC Commissioner: 

10 

 

(a)  sections 49 to 58 of the old Act; 

11 

 

(b)  a provision of any instrument made under those sections. 

12 

13  Reports by Commonwealth Ombudsman 

13 

(1) 

If, in relation to a financial year ending at or before the transition time, 

14 

the Commonwealth Ombudsman has not, by the transition time, 

15 

prepared and given to the Parliament a report under section 54A of the 

16 

old Act about examinations conducted under Division 3 of Part 1 of 

17 

Chapter 7 of that Act during the financial year, then the Commonwealth 

18 

Ombudsman must, as soon as practicable after the transition time, 

19 

prepare and present to the Parliament a report in accordance with that 

20 

section on those examinations during that financial year. 

21 

(2) 

If the first financial year to end after the transition time includes a 

22 

period before the transition time, the report under section 65 of the new 

23 

Transitional provisions  Schedule 2 

   

 

 

No.      , 2013 

Building and Construction Industry (Consequential and Transitional 

Provisions) Bill 2013 

13 

 

Act in relation to that financial year must also cover examinations 

conducted under Division 3 of Part 1 of Chapter 7 of the old Act during 

that period. 

14  Payment for expenses incurred in attending an 

examination 

(1) 

Regulations made by the Governor-General for the purposes of 

section 58 of the old Act that are in force immediately before the 

transition time, other than regulation 7.13, continue in force after that 

time as if the regulations were rules made by the Minister for the 

purposes of section 63 of the new Act. 

10 

(2) 

The table translates terms in the regulations for the purposes of this 

11 

item. 

12 

 

13 

Translations of terms in regulations 

Item 

A reference to this term ...  

is taken to be a reference to this 

term ...  

an examination (within the meaning 

of the old Act) 

an examination (within the meaning 

of the new Act). 

an examination notice (within the 

meaning of the old Act) 

an examination notice (within the 

meaning of the new Act). 

subsection 58(1) of the old Act 

subsection 63(1) of the new Act. 

(3) 

Subitem (1) does not prevent the repeal of those regulations. 

14 

15  Continuation of appointment of Federal Safety Officers 

15 

(1) 

This item applies to a person if, immediately before the transition time, 

16 

an instrument is in force under section 60 of the old Act appointing the 

17 

person as a Federal Safety Officer. 

18 

(2) 

The instrument has effect, after the transition time, as if it were an 

19 

instrument made by the Federal Safety Commissioner under section 68 

20 

of the new Act appointing the person as a Federal Safety Officer. 

21 

16  Identity cards for Federal Safety Officers 

22 

 

The identity card of a person who is a Federal Safety Officer 

23 

immediately before the transition time that was issued under section 61 

24 

Schedule 2  Transitional provisions 

   

 

 

14 

Building and Construction Industry (Consequential and Transitional 

Provisions) Bill 2013 

No.      , 2013 

 

of the old Act is taken after that time to have been issued under 

section 69 of the new Act. 

17  Disclosure of information by the ABC Commissioner or 

the Federal Safety Commissioner 

(1) 

This item applies if information was acquired under the old Act by any 

of the following persons in the course of performing functions or 

exercising powers: 

 

(a)  the Director; 

 

(b)  an inspector; 

 

(c)  a member of staff referred to in subsection 26K(1) of that 

10 

Act; 

11 

 

(d)  a person assisting the Director under section 26L of that Act; 

12 

 

(e)  a consultant under section 26M of that Act; 

13 

 

(f)  a person assisting an inspector; 

14 

 

(g)  the Federal Safety Commissioner; 

15 

 

(h)  a Federal Safety Officer; 

16 

 

(i)  an APS employee assisting the Federal Safety Commissioner; 

17 

 

(j)  a consultant under section 34 of that Act. 

18 

(2) 

For the purposes of section 105 of the new Act, that information is 

19 

taken to have been acquired by the following person in the course of 

20 

performing functions or exercising powers: 

21 

 

(a)  for paragraphs (1)(a) to (f)--the ABC Commissioner; 

22 

 

(b)  for paragraphs (1)(g) to (j)--the Federal Safety 

23 

Commissioner (within the meaning of the new Act). 

24 

18  Protected information 

25 

 

For the purposes of sections 105 and 106 of the new Act, information 

26 

that is protected information under section 65 of the old Act is taken to 

27 

be protected information under the new Act. 

28 

19  Legal proceedings 

29 

 

If any proceedings to which the Director is a party (including as a result 

30 

of section 71 of the old Act) are pending in a court or tribunal 

31 

immediately before the transition time, the ABC Commissioner is, after 

32 

the transition time, the party to those proceedings. 

33 

Transitional provisions  Schedule 2 

   

 

 

No.      , 2013 

Building and Construction Industry (Consequential and Transitional 

Provisions) Bill 2013 

15 

 

20  Settled matters 

(1) 

The ABC Commissioner (or an inspector) may begin or continue to 

participate in a building proceeding (within the meaning of section 73 

of the old Act) even if the proceeding relates to a matter that was settled 

(as referred to in that section) before the transition time. 

(2) 

The ABC Commissioner (or an inspector) may institute a building 

proceeding (within the meaning of section 73A of the old Act) even if 

the conduct giving rise to the proceeding was the subject of a matter 

that was settled (as referred to in that section) before the transition time. 

21  Director etc. not liable for conduct in good faith 

10 

 

Despite the repeal by this Act of section 77 of the old Act, that section 

11 

continues to apply, after the transition time, in relation to anything done, 

12 

or omitted to be done, before that time by a protected person (within the 

13 

meaning of that section). 

14 

22  Assets and liabilities of old Office 

15 

Assets and liabilities of the old Office immediately before the transition 

16 

time continue, after the transition time, to be assets and liabilities of the 

17 

Commission (without any conveyance, transfer or assignment). 

18 

23  References in instruments to old Office and Director 

19 

(1) 

A reference to the old Office in an instrument that is in force 

20 

immediately before the transition time has effect, after the transition 

21 

time, as a reference to the Commission. 

22 

(2) 

A reference to the Director in an instrument that is in force immediately 

23 

before the transition time has effect, after the transition time, as a 

24 

reference to the ABC Commissioner. 

25 

24  Effect of things done by, or in relation to, the old Office 

26 

A thing done by, or in relation to, the old Office before the transition 

27 

time has effect, after the transition time, as if it had been done by, or in 

28 

relation to, the Commission. 

29 

Schedule 2  Transitional provisions 

   

 

 

16 

Building and Construction Industry (Consequential and Transitional 

Provisions) Bill 2013 

No.      , 2013 

 

25  Effect of this Schedule on the operation of section 7 of the 

Acts Interpretation Act 1901 

This Schedule does not limit the operation of section 7 of the Acts 

Interpretation Act 1901

26  Rules 

(1) 

The Minister may, by legislative instrument, make rules prescribing 

matters: 

 

(a)  required or permitted by this Act to be prescribed by the 

rules; or 

 

(b)  necessary or convenient to be prescribed for carrying out or 

10 

giving effect to this Act. 

11 

(2) 

The rules may prescribe matters of a transitional nature (including 

12 

prescribing any saving or application provisions) relating to: 

13 

 

(a)  the repeals or amendments made by this Act; or 

14 

 

(b)  the enactment of this Act or the Building and Construction 

15 

Industry (Improving Productivity) Act 2013

16 

 


[Index] [Search] [Download] [Related Items] [Help]