NATIONAL ELECTRICITY (NORTHERN TERRITORY) (NATIONAL UNIFORM LEGISLATION) ACT 2015 (NO 16 OF 2015) - SCHEDULE 2

Schedule 2     Local distribution systems

section 9

1     Darwin distribution system

The distribution system:

    (a)     located in the Darwin region; and

    (b)     operated, as at 1 July 2015, by Power and Water Corporation;

but not including the Darwin to Katherine 132kV power line described in item 5.

2     Katherine distribution system

The distribution system:

    (a)     located in the Katherine region; and

    (b)     operated, as at 1 July 2015, by Power and Water Corporation;

but not including the Darwin to Katherine 132kV power line described in item 5.

3     Tennant Creek distribution system

The distribution system:

    (a)     located in the Tennant Creek region; and

    (b)     operated, as at 1 July 2015, by Power and Water Corporation.

4     Alice Springs distribution system

The distribution system:

    (a)     located in the Alice Springs region; and

    (b)     operated, as at 1 July 2015, by Power and Water Corporation.

5     Darwin to Katherine 132kV power line

The 132 kV power line that extends from the network 132 kV bus at Channel Island Power Station to a 132/22 kV zone substation adjacent to the Katherine Power Station, with 132/22 kV zone substations at Manton and Batchelor and a 132/66kV transmission terminal station at Pine Creek.