Northern Territory Numbered Acts

[Index] [Table] [Search] [Search this Act] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

PETROLEUM LEGISLATION AMENDMENT ACT 2022 (NO 33 OF 2022) - SECT 105

Schedule 1 replaced

Schedule 1

repeal, insert

Schedule 1     Fees and amounts for Act and Regulations

regulation 4(1)

Provision

Description

Revenue units

section 16

Application for grant of permit

15 748

section 23

Application for renewal of permit

8 184

section 26

Annual fee in relation to a permit per block per annum

435

section 28

Variation, suspension or waiver of condition of permit

6 034

section 32

Application for retention licence

17 504

section 37

Application for renewal of retention licence

8 087

section 39

Annual fee in relation to a retention licence per block per annum

9 415

section 41

Variation of condition of retention licence

6 263

section 45

Application for production licence

36 316

section 51

Application for renewal of production licence

6 671

section 53

Annual fee in relation to a production licence per block or part of a block per annum

11 500

section 55

Variation of condition of production licence

4 847

section 57A

Application for grant of access authority

5 006

section 57AAA

Application to approve recovery of petroleum on appraisal basis

18 158

section 57AAB

Application to approve transfer of interest in application

1 415

section 61(2)

Application for approval of plan

57

section 73

Application to surrender all or part of permit area

761

section 73

Application to surrender all or part of licence area

761

section 93

Application to approve transfer of an interest

1 934

section 94(2)

Entry in Register of name of applicant as permittee or licensee

57

section 96(4)

Approval of instruments relating to interests

165

section 100

Inspection of Register and instruments

19

section 102(2)

Copy of or extract from Register or instrument (per page)

6

section 102(3)

Certificate issued by Registrar

33

section 104E

Application to approve change in control

1 415

regulation 31

Application for approval of access agreement

1 142

regulation 33

Application for registration of access agreement

666

regulation 35

Application for inspection of register

19

regulation 36

Application for certified copy or certificate

33

regulation 39

Application for approval and registration of variation of access agreement (other than a variation by order of the Tribunal)

1 142

regulation 39

Application for registration of variation of access agreement by order of the Tribunal

666

regulation 69(4)

Application for registration of agreement under transitional provisions

1 142

Schedule 1A     Fees for resource management, activity and infrastructure plans

regulation 4(2)

Description

Revenue units

The fee for an application for the approval of a well operations management plan under section 61(2)(b) of the Act is to be determined by its complexity as follows:


–     high complexity well operations management plan , being a plan that involves the management of a well that includes any of the following:

o     high pressure – the maximum anticipated surface pressure is greater or equal to 10,000 psi (69 MPa) or needs the deployment of pressure control equipment with a rated working pressure in excess of 10,000 psi (69 MPa));

o     high temperature – the undisturbed bottom hole temperature at prospective reservoir depth or total depth is greater or equal to 149 degrees Celsius or (300 degrees Fahrenheit);

o     hydraulic fracturing/well stimulation;

o     the management of risks arising from the presence of hydrogen sulphide from the reservoir, including by the deployment of additional equipment, plans and emergency procedures;

o     managed pressure drilling;

o     a well outside known fields, or the first well drilled in an petroleum field where no other petroleum production exists;

o     novel drill operations and equipment needing the deployment of specific non-standard or new equipment or techniques not currently in use or approved for use;

11 614

–     medium complexity , being a plan that is not high complexity and covers the operation of more than one well;

7 946

–     low complexity , being all other plans

6 113

The fee for an application for the approval of a field management plan under section 61(2)(b) of the Act

34 622

The fee for an application for the approval of a petroleum surface infrastructure plan under section 61(2)(b) of the Act

11 397

The fee for an application for the approval of a revised well operations management plan under section 61B(5) of the Act is to be determined by its complexity as follows:

-     high complexity;

-     medium complexity;

-     low complexity

The level of complexity is the same as the level of complexity for the approval of the well operations management plan except that the only activities to be taken into account are activities not previously covered by the plan.


8 333

5 702

4 386

The fee for an application for the approval of a revised field management plan under section 61B(5) of the Act is to be determined by its complexity as follows:


–     medium complexity , being a revised plan that is not low complexity;

16 061

–     low complexity , being a revised plan:

o     with a minimum of 10 years production data; or

o     where the permittee or licensee does not propose to make a significant change to development or management strategy of the field covered by the plan

12 354

The fee for an application for the approval of a revised petroleum surface infrastructure plan under section 61B(5) of the Act is to be determined by its complexity as follows:


–     high complexity , being a revised plan that includes the development of a new petroleum processing facility;

7 944

–     medium complexity , being a revised plan that:

o     is not high complexity; and

o     includes the development of new well site facilities and pipelines;

5 435

–     low complexity , being any other revised plan

4 181

The fee for an application to vary a condition of an approved plan under section 61C(3)(b) of the Act

4 386

Schedule 1B     Fees for environment management plans

regulation 4(3)

1         In this Schedule:

"assessment rating "means the assessment rating for a particular activity category specified in the Table.

2     (1)     The monetary value of the base fee is 28 047 revenue units.

    (2)     The monetary value of a unit value is 2 104 revenue units.

3     (1)     The fee for an application for the approval of an environment management plan has 2 components:

    (a)     the base fee; and

    (b)     the sum of the assessment ratings for each title area for the regulated activities to which the environment management plan relates, multiplied by the unit value.

    (2)     In calculating the component of the fee under subclause (1)(b):

    (a)     if 2 or more activities to be undertaken in a particular title area fall into a particular activity category, that category will be counted once in relation to that title area; and

    (b)     an activity to be undertaken in 2 or more title areas will be counted once for each title area; and

    (c)     for 2 or more seismic surveys to be undertaken in a title area, the total length of seismic surveys in that title area are to be added together for the purposes of the Table.

    (3)     The fee for a revision of a current environment management plan, payable when the proposed revision is submitted to the Minister, is the same as the fee for the approval of an environment management plan.

Table

Activity category

Assessment rating

Land clearing (for any purpose) and earthworks (including cutting, filling, excavating or trenching)

2

Seismic surveys (total length):

up to 100 km

more than 100 km

1

2

The drilling, completion, operation, modification, decommissioning, suspension or abandonment of a well that does not include hydraulic fracture stimulation activities – up to 3 wells

2

The drilling, completion, operation, modification, decommissioning, suspension or abandonment of a well that does not include hydraulic fracture stimulation activities – 4 or more wells

4

The drilling, completion, operation, modification, decommissioning, suspension or abandonment of a well that includes hydraulic fracture stimulation activities – up to 3 wells

6

The drilling, completion, operation, modification, decommissioning, suspension or abandonment of a well that includes hydraulic fracture stimulation activities – 4 or more wells

12

The construction, operation, modification, decommissioning, dismantling or removal of other facilities used for the recovery or processing of petroleum

6

The construction, operation, modification, decommissioning, dismantling or removal of any other facilities

3



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback