Queensland Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]
WATER PLAN (MORETON) 2007 - REG 37
Deciding operating arrangements and supply requirements
37 Deciding operating arrangements and supply requirements
(1) In deciding the operating arrangements and supply requirements for water
infrastructure and proposed water infrastructure under the resource operations
licence for each water supply scheme mentioned in section 36 , the chief
executive must consider— (a) the impact of the infrastructure’s or
proposed infrastructure’s operation on the following— (i) the water
allocation security objectives;
(ii) water quality;
(iii) brackish water
habitats in estuarine reaches;
(iv) instream water levels;
(v) erosion of
the bed and banks of watercourses;
(vi) riparian vegetation;
(vii) the
extent to which artificial variations in instream water levels and flows may
adversely affect natural ecosystems;
(viii) recreation and aesthetic values
of the plan area;
(ix) cultural values, including, for example, cultural
values of the traditional owners of the plan area; and
(b) the impact of the
infrastructure or proposed infrastructure on the movement of fish and other
aquatic species; and
(c) the impact of the transfer of water between
watercourses; and
(d) the likelihood of fish deaths caused by the operation
of the infrastructure; and
(e) the joint operation of existing and proposed
infrastructure; and
(f) any system operating plan applying to the plan area;
and
(g) any regional water security program for the SEQ region.
(2)
Subsection (1) does not limit the matters the chief executive may consider.
AustLII: Copyright Policy
| Disclaimers
| Privacy Policy
| Feedback