Table 1—Requirements | |||
Column 1 | Column 2 | Column 3 | |
Information to be given | When information to be given | Way information to be given | |
details of the following for the works through which the water is taken—(a) the works;(b) each measurement device attached to the works;(c) each other relevant authorisation held by the holder under which water is taken using the works;(d) each other person who takes water using the works | within 20 business days after each time the measurement device attached to the works is inspected under section 121B | in the approved form | |
details of each change to any of the following for the works through which the water is taken—(a) the works;(b) the relevant authorisations held by the holder under which water is taken using the works;(c) the persons who take water using the works | within 10 business days after the change | in the approved form | |
the reading from a meter, or record made by a telemetry device, attached to the works through which the water is taken at each time the meter or telemetry device is replaced | within 10 business days after the replacement | in the approved form | |
the reading from a meter, attached to the works through which the water is taken, of water taken in each water period stated in table 2 for the authorisation | within 10 business days after the water period ends | in the way stated in the measurement standards | |
the record made by a telemetry device, attached to the works through which the water is taken, of water taken in each day | at the end of the day | in the way stated in the measurement standards |
Table 2—Water periods for relevant authorisations | ||
Column 1 | Column 2 | |
Relevant authorisation | Water period | |
relevant authorisation for taking water in any of the following areas—(a) the Border Rivers Alluvium (deep) underground water sub-unit under the Water Plan (Border Rivers and Moonie) 2019 ;(b) the Central Condamine Alluvium underground water sub-area under the Water Plan (Condamine and Balonne) 2019 ;(c) the Coastal Burnett groundwater management area under the Water Plan (Burnett Basin) 2014 ;(d) the Don and Dee groundwater sub-area under the Water Plan (Fitzroy Basin) 2011 | both of the following—(a) the period from 1 July of a year to 1 March of the following year;(b) the period from 1 July of a year to 30 June of the following year | |
relevant authorisation for taking water in the Dawson Valley water management area under the Water Plan (Fitzroy Basin) 2011 | the period from 1 October of a year to 30 September of the following year | |
relevant authorisation for taking water in the Lockyer Valley groundwater management area under the Water Plan (Moreton) 2007 | the period from 1 May of a year to 30 April of the following year | |
relevant authorisation for taking water in the Bowen underground water area on plan CAS3065 | both of the following—(a) the period from 1 April to 1 November of a year;(b) the period from 1 April of a year to 31 March of the following year | |
relevant authorisation not otherwise mentioned in this table | the period from 1 July of a year to 30 June of the following year |