Queensland Consolidated Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

WATER REGULATION 2016 - SCHEDULE 11A

SCHEDULE 11A – Measurement requirements— information about water taken

Table 1—Requirements
Column 1 Column 2 Column 3
Information to be given When information to be given Way information to be given
details of the following for the works through which the water is taken—(a) the works;(b) each measurement device attached to the works;(c) each other relevant authorisation held by the holder under which water is taken using the works;(d) each other person who takes water using the works within 20 business days after each time the measurement device attached to the works is inspected under section 121B in the approved form
details of each change to any of the following for the works through which the water is taken—(a) the works;(b) the relevant authorisations held by the holder under which water is taken using the works;(c) the persons who take water using the works within 10 business days after the change in the approved form
the reading from a meter, or record made by a telemetry device, attached to the works through which the water is taken at each time the meter or telemetry device is replaced within 10 business days after the replacement in the approved form
the reading from a meter, attached to the works through which the water is taken, of water taken in each water period stated in table 2 for the authorisation within 10 business days after the water period ends in the way stated in the measurement standards
the record made by a telemetry device, attached to the works through which the water is taken, of water taken in each day at the end of the day in the way stated in the measurement standards

Table 2—Water periods for relevant authorisations
Column 1 Column 2
Relevant authorisation Water period
relevant authorisation for taking water in any of the following areas—(a) the Border Rivers Alluvium (deep) underground water sub-unit under the Water Plan (Border Rivers and Moonie) 2019 ;(b) the Central Condamine Alluvium underground water sub-area under the Water Plan (Condamine and Balonne) 2019 ;(c) the Coastal Burnett groundwater management area under the Water Plan (Burnett Basin) 2014 ;(d) the Don and Dee groundwater sub-area under the Water Plan (Fitzroy Basin) 2011 both of the following—(a) the period from 1 July of a year to 1 March of the following year;(b) the period from 1 July of a year to 30 June of the following year
relevant authorisation for taking water in the Dawson Valley water management area under the Water Plan (Fitzroy Basin) 2011 the period from 1 October of a year to 30 September of the following year
relevant authorisation for taking water in the Lockyer Valley groundwater management area under the Water Plan (Moreton) 2007 the period from 1 May of a year to 30 April of the following year
relevant authorisation for taking water in the Bowen underground water area on plan CAS3065 both of the following—(a) the period from 1 April to 1 November of a year;(b) the period from 1 April of a year to 31 March of the following year
relevant authorisation not otherwise mentioned in this table the period from 1 July of a year to 30 June of the following year



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback