An application is a properly made application if--
(a) the application is made in compliance with section 260(1) and (3); and
(b) if the application relates to land in a declared master planned area and the structure plan for the master planned area requires a master plan for the development--the master plan has been approved or a master plan application for the master plan was made with or before the making of the application.