GOVERNMENT OWNED CORPORATIONS (PUMPED HYDRO ENERGY STORAGE RESTRUCTURE) REGULATION 2022 - REG 11
Correction of errors
11 Correction of errors
(1) At any time within 1 year after the commencement, the shareholding
Ministers of Powerlink may— (a) correct a minor error in a transfer schedule
or an exclusion schedule; or
(b) correct the misidentification of an asset,
liability, instrument or employee identified in a transfer schedule; or
Example— correction of the real property description of an asset
(c)
correct the misidentification of a liability, or a class of liabilities,
identified in an exclusion schedule; or
(d) correct an error in the accounts
of Powerlink or the pumped hydro entity relating to the value of— (i) an
asset, liability or instrument identified in a transfer schedule; or
(ii) an
associated liability for an asset, instrument or employee identified in a
transfer schedule.
(2) The correction or change is taken to have been made
immediately before the commencement.
(3) In this section—
"associated liability" , for an asset, instrument or employee identified in a
transfer schedule, means a liability to which section 7 (1) applies as result
of the asset, instrument or employee being identified in the transfer
schedule.