After section 12W--
insert--
'In this part--
Cloncurry pipeline project works means works reasonably connected with, or incidental to, the construction of the Cloncurry pipeline as described in the pipeline report.
Examples of works reasonably connected with, or incidental to, the construction of the pipeline--
construction of a permanent or temporary road for access
installation of a pump, telecommunications facility or water storage facility
pipeline report means SunWater's report of 17 July 2009 called 'Cloncurry pipeline project description'.
reserved works means the parts of the Cloncurry pipeline project works that, in the circumstances, can only be carried out with the exercise of a power the Coordinator-General may exercise under the Act only for or in connection with works undertaken by the Coordinator-General.
Example of a power the Coordinator-General may exercise only for works undertaken by the Coordinator-General--
the power under section 160 of the Act to obtain material from a watercourse
SunWater means SunWater Limited ACN 131 034 985.
'(1) Subsection (2) is a direction for section 100 of the Act.
'(2) SunWater must undertake all parts of the Cloncurry pipeline project works that are not reserved works.
'(1) Subsection (2) is a direction for section 109 of the Act.
'(2) The Coordinator-General must undertake the reserved works.
'For the Cloncurry pipeline project works, the Coordinator-General is authorised to undertake works in, on, over, through or across the Cloncurry River.
'The Coordinator-General is authorised--
(a) to take sand, stone, gravel and other material from the Cloncurry River; and
(b) to use the sand, stone, gravel and other material for the Cloncurry pipeline project works.
'(1) Subsection (2) is a direction for section 140(1)(b) of the Act.
'(2) The taking, and use for the Cloncurry pipeline project works, of sand, stone, gravel and other material authorised under section 12ZB is exempt development under the Integrated Planning Act.'.