Tasmanian Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]
OCCUPATIONAL LICENSING (BUILDING SERVICES WORK) REGULATIONS 2016 - SCHEDULE 1
- Building services work
SCHEDULE 1 - Building services work Regulation 4
PART 1 - Prescribed work
1. Building work or demolition work that is
(a) work carried out on, or as part of, the construction, erecting or
re-erecting, installation, replacement, repair, underpinning, alteration,
addition, maintenance, demolition or removal of any premises, building or
temporary structure; or
(b) excavating or filling incidental to an activity referred to in paragraph
(a); or
(c) the management, carrying out, certification or entering of a contract for
any of the types of work in paragraph (a) or (b).
2. Design work that is
(a) architectural analysis, design and documentation of any premises, building
or temporary structure; or
(b) engineering analysis, design and documentation of any premises, building
or temporary structure, or of building components and structural systems,
including research, analysing criteria, and finding and analysing solutions;
or
(c) design of the building services of any premises, building or temporary
structure, or of building components or systems, including matters related to
the design of mechanical, electrical, hydraulic, acoustics, energy management
and fire protection components or systems; or
(d) assessment and certification of architectural or engineering designs of
proposed building work, hydraulic or plumbing work, or demolition work,
including reviews by specialists, experts, and third parties, of designs or
performance solutions; or
(e) the management, carrying out, certification or entering of a contract for
any of the types of work in paragraphs (a), (b), (c) or (d).
3. Assessment or certification work that is
(a) assessment and certification of architectural or engineering designs of
proposed building work, or demolition work, including work performed for the
purpose of obtaining statutory approvals, permits or authorisations to perform
that building or demolition work; or
(b) assessment and certification of designs of proposed plumbing work,
plumbing installations or hydraulic work, or engineering hydraulic work,
including for the purpose of obtaining statutory approvals, permits or
authorisations to perform that plumbing work; or
(c) inspection, assessment, testing, reporting, advising, authorisation or
certification of building work, premises, buildings or temporary structures;
or
(d) inspection, assessment, testing, reporting, advising or certification of
plumbing work, plumbing installations, building services-hydraulic work or
engineering hydraulic work; or
(e) the management, carrying out, certification or entering of a contract for
any of the types of work in paragraphs (a), (b), (c) or (d).
PART 2 - Excluded work
1. Work that
(a) is low-risk work within the meaning of the Building Act 2016 ; and
(b)
. . . . . . . .
(c) is not required under that Act to be performed by a licensed builder,
within the meaning of that Act.
2. Work that is performed by a person as part of an
investigation of the conditions of a building or premises and performed for
the purposes of the person providing a certificate referred to in section 321
of the Building Act 2016 in respect of the building or premise s .
AustLII: Copyright Policy
| Disclaimers
| Privacy Policy
| Feedback