The operator of a determined major hazard facility must provide the regulator with a safety case outline for the major hazard facility within 3 months after the facility is determined to be a major hazard facility.Penalty: In the case of (a) an individual, a fine not exceeding $3 600; or(b) a body corporate, a fine not exceeding $18 000.