r. 5
After regulation 25 of the Principal Regulations insert —
For the purposes of section 41AD(1) of the Act, a work schedule must include the following information—
(a) a description of the activities to be undertaken for the exploration works;
(b) accurate site plans that show—
(i) the location of the exploration works; and
(ii) access routes in relation to identifiable geographic features, including but not limited to tracks, buildings and fences, waterways and vegetation;
(c) the location and conservation status of native vegetation and the presence of threatened flora and fauna;
(d) any other relevant site-specific information about impacts and proposed control or mitigation measures and rehabilitation.".