Victorian Numbered Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

OFFSHORE PETROLEUM AND GREENHOUSE GAS STORAGE REGULATIONS 2011 (SR NO 153 OF 2011) - REG 304

Requirement for weekly survey report

    (1)     A greenhouse gas titleholder who undertakes a geophysical or geological survey in a title area must give the Minister a weekly survey report as soon as practicable after the end of each week of the survey.

Penalty:     20 penalty units.

    (2)     In this regulation—

"weekly survey report" means a report that includes—

        (a)     the name of the survey; and

        (b)     the title under which the survey is being conducted; and

        (c)     the name of the titleholder; and

        (d)     the name of the contractor conducting the survey; and

        (e)     the name of the vessel or aircraft conducting the survey; and

        (f)     a map showing where the survey was conducted during the week; and

        (g)     the number of kilometres or square kilometres for which data was acquired during the week; and

        (h)     the number of points at which data was acquired during the week; and

              (i)     the number of lines of data acquired during the week; and

        (j)     the amount of downtime during the week due to equipment problems, bad weather or other circumstances; and

        (k)     the percentage of the survey completed at the end of the week;

"week of the survey" means—

        (a)     the week starting on the first day of data acquisition; and

        (b)     each subsequent week.

Note

Notice of a geophysical or geological survey is required under regulation 335 , and the survey will also require approval as an activity under Chapter 2.



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback