Victorian Numbered Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

OFFSHORE PETROLEUM AND GREENHOUSE GAS STORAGE REGULATIONS 2011 (SR NO 153 OF 2011) - REG 42

Vessels and structures that are not facilities

For the purposes of clause 8(d) of Schedule 3 to the Act, the vessels and structures in the following table are not facilities.

Table

Item

Vessel or structure

1

Vessel supporting a remotely-operated vehicle that is being used in connection with—

        (a)     inspection; or

        (b)     cleaning; or

        (c)     non-disturbing span rectification (for example, grout bagging); or

        (d)     the operation of a valve; or

        (e)     the recovery of debris; or

        (f)     valve control unit change out

2

Vessel supporting a diving operation that relates to—

        (a)     inspection; or

        (b)     cleaning; or


        (c)     non-disturbing span rectification
(for example, grout bagging); or

        (d)     the operation of a valve; or

        (e)     the recovery of debris; or

        (f)     valve control unit change out

3

Vessel supporting a remotely-operated vehicle that is being used in connection with the removal of weight coating from a pipe before hydro-testing

4

Vessel supporting a diving operation that relates to the removal of weight coating from a pipe before hydro-testing

5

Vessel laying an umbilical or a cable

6

Vessel—

        (a)     laying a clump weight anchor or mattress; or

        (b)     conducting rock dumping on a pipe during its construction (before hydro-testing)

7

Vessel placing support structures or foundations on the sea bed for the purpose of a facility, including—

        (a)     foundation supports for a platform jacket, pipe end manifold or another manifold; or

        (b)     foundation piles

8

Vessel undertaking pipe trenching and burial during the construction of a facility (before hydro-testing)

9

Dumb barge that is "hipped-up" to a facility

10

Vessel installing and attaching a short length flexible pipe or jumper if there is no petroleum or greenhouse gas substance contained in the pipe or equipment to which the flexible pipe or jumper is being connected

11

Vessel placing a subsea pipe manifold or pipe end manifold during the construction of a facility (before hydro-testing)

12

Vessel attaching a cathodic protection anode to a pipe if welding is not required

r. 42

Note

Under clause 8(d) of Schedule 3 to the Act, a vessel or structure is taken not to be a facility for the purposes of that Schedule if the vessel or structure is a vessel or structure used for any purpose such that it is declared by the regulations not to be a facility.